1. BIDDING INSTRUCTIONS
Technical Proposal
Bidders shall submit a proposal clearly providing the following information:
a: The proposed approach to address the required scope of work and the defined deliverables (maximum 10 pages, A4 size). The proposed approach should address the minimum:
- Sufficient details to allow assessment of the bidders understanding of the requirements.
- Previous similar experience.
- Relevant experience of the proposed team members.
b: CVs of the assigned resource(s) for the project, and related attestations. It is up to the bidder to propose the size of the team that executes the work and produces the deliverables in the time line allocated. The Purchaser may accommodate a reasonable number of personnel at the current facilities. The CVs shall clearly distinguish if the proposal is for Key Personnel or not.
Deadline Date: Friday 21 August 2026
Requirement: Provision and On-Going Support for BMD OPSLOOP Voice Services
Location: 100% onsite in Mons, BEL
Period of Performance: 2026 BASE: From September 1, 2026 (tentative) to December 31, 2026, with possibility to exercise the following options:
2027 Option: January 1, 2027 until December 31, 2027.
2028 Option: January 1, 2028 until December 31, 2028.
Required Security Clearance: NATO COSMIC TOP SECRET (NATO SECRET security clearance is accepted with CTS in progress – deadline to have CTS in place by end of October 2026).
Special Terms and Conditions: Statement of Work
1. PURPOSE
The purpose of this Statement of Work (SoW) is to define the services for BMD OPSLOOP Voice services in NCI Agency Mons, Belgium. The NCI Agency (hereinafter referred to as the “Purchaser”) seeks a qualified Contractor to provide continuous BMD OPSLOOP Voice services in support of Purchaser personnel based in Mons, Belgium, as well as personnel on official duty at that location.
2. OBJECTIVES
The objective of this role is to provide first level support for issues related to BMD OPSLOOP Voice Services and to ensure the optimal performance, security, and reliability of BMD OPSLOOP Voice services.
The Contractor shall also provide end-user support, including technical assistance and user guidance where required. The overall objective is to improve user satisfaction, reduce support response times, and enhance the quality and efficiency of IT service delivery.
During the performance of the contract, the Contractor shall operate as an integral part of the Purchaser’s NATO Digital Workplace Centre (NDWC), Shared Workspace Group (SWG), delivering on-site BMD OPSLOOP Voice services support.
With this SoW, the Purchaser aims to achieve the following objectives:
- Leverage industry expertise and best practices in installation, configuration, monitoring and daily operation of commercial off the shelf (COTS) technologies and software in the collaboration area.
- Ensure that BMD OPSLOOP Voice services are functional and fully operational.
- Perform first-line troubleshooting and escalate issues as required and maintain incident records and operational logs.
- Support installation of standard BMD OPSLOOP Voice Systems.
- Provide user assistance before, during, and after meetings.
Additional support may be requested to augment the baseline staff for large conferences, VIP meetings, or high-visibility events.
3. INTRODUCTION
NATO Digital Workplace Centre (NDWC), part of NCI Agency, provides simple yet innovative solutions that underpin the Digital Transformation of NATO by providing a feature-rich Digital Workplace, which enables NATO staff members to connect, communicate, and collaborate.
Shared Workspace service area delivers the following user-facing services to NATO Commands, NATO Force structure and Nations in all 32 Allied Nations:
Printing, scanning and copying services, client frontend provisioning, management, operation and lifecycle across multiple separate networks of different classifications.
Voice and Video conferencing server backend and frontend devices and rooms, maintenance, management, operation and troubleshooting across multiple separate networks of different classifications.
AV/VTC service is designed to give value-added auditory and visual experience to the customers and users while doing their consultation sessions or briefings using the latest technology available.
The services integrate with other services and enable NATO-specific functional applications higher up the software stack. Through several on-going streams of work in Q4’24 and onwards, the services are rapidly evolving from using fully on-premise to a mixture of on-premise and public cloud technologies.
4. PURCHASER SUPPORT STRUCTURE
The Purchaser support structure is organized into three levels:
Level 1 (L1): Centralized Service Desk providing virtual first-line support.
Level 2 (L2): On-site technical support, including touch-labor and specialized support provided by the CIS Support Unit or IT Service Kiosk.
Level 3 (L3): Centralized engineering support provided by specialist technical teams.
a. Deliverables
The principal deliverable of this Statement of Work (SoW) is the provision and continuous delivery of the BMD OPSLOOP Voice Service (hereinafter referred to as the “Service”).
The Contractor shall:
i. BMD OPSLOOP Voice Implementation
Provide first level of support to end users for daily business.
Ensure that BMD OPSLOOP Voice services are functional and fully operational.
Perform first-line troubleshooting, conduct daily preventive readiness checks of BMD OPSLOOP Voice systems, escalate issues as required and maintain incident records and operational logs.
Support the installation of standard BMD OPSLOOP Voice Systems.
KPI: Service availability: Measurement and target: ≥99.5% availability during agreed operational/service hours, excluding approved maintenance and external dependencies. Acceptance criteria: Availability report demonstrates achievement of target; all exclusions are documented and approved. Evidence: Monitoring report, outage records, maintenance calendar.
KPI: Daily readiness checks: Measurement and target: 100% of scheduled checks completed; ≥98% completed within the agreed daily time window. Acceptance criteria: Checklist completed for every scheduled operational day; exceptions documented, actioned and escalated. Evidence: Signed/electronic checklists, operational logs.
KPI: First-line response: Measurement and target: ≥95% of incidents acknowledged within the applicable SLA; 100% of critical incidents acknowledged within the critical-incident SLA. Acceptance criteria: Service-management records contain timestamps, categorisation, actions and status. Evidence: Incident records and SLA report.
KPI: First-line resolution: Measurement and target: ≥80% of incidents within the agreed first-line scope resolved without unnecessary escalation. Acceptance criteria: Resolution rate achieved; unresolved incidents correctly escalated with diagnostic evidence. Evidence: Incident and escalation records.
KPI: Escalation timeliness: Measurement and target: ≥95% of issues outside first-line scope escalated within the agreed SLA; 100% of critical issues escalated immediately in accordance with procedures. Acceptance criteria: Escalations include impact, priority, troubleshooting performed and supporting logs. Evidence: Tickets, escalation notices, operational logs.
KPI: Record completeness: Measurement and target: ≥98% of incidents and operational events recorded accurately; 100% of critical incidents fully documented. Acceptance criteria: Mandatory fields completed, including cause/symptoms, actions, timestamps, affected configuration items and resolution. Evidence: Incident-record quality sample.
KPI: Standard installation success: Measurement and target: ≥95% of installations accepted at first verification; 100% supported by installation and test records. Acceptance criteria: Installation follows approved baseline; functional test passed; configuration and asset records updated. Evidence: Installation checklist, test results, configuration records.
KPI: User support satisfaction: Measurement and target: ≥85% positive satisfaction or agreed equivalent score, subject to a representative response level. Acceptance criteria: Survey results meet target; material complaints are addressed through corrective actions. Evidence: Survey results and action log.
The deliverable is accepted when:
- The agreed support coverage was provided throughout the period.
- Availability and readiness-check targets were achieved.
- Incidents were handled, documented and escalated according to approved procedures and SLAs.
- Standard installations passed functional and configuration verification.
- No unresolved critical failure attributable to the contractor remains at the acceptance date, unless an approved corrective-action plan exists.
ii. Maintenance
Preventive maintenance, readiness checks, and escalation of complex issues.
Monitor BMD OPSLOOP Voice systems availability, reliability, and performance.
Analyze incident service request, and fault trends to identify recurring issues and improvement opportunities.
KPI: Preventive-maintenance completion: Measurement and target: 100% of scheduled preventive-maintenance activities completed; ≥95% completed by the planned date. Acceptance criteria: Maintenance tasks completed against the approved schedule; deferrals formally authorised. Evidence: Maintenance schedule, work orders and checklists.
KPI: Post-maintenance functionality: Measurement and target: 100% of maintained systems pass post-maintenance functional and readiness testing. Acceptance criteria: Test results demonstrate restoration to the approved operational baseline. Evidence: Test records and readiness confirmation.
KPI: System availability: Measurement and target: ≥99.5% during agreed service hours, excluding approved maintenance and accepted dependencies. Acceptance criteria: Availability report reconciles monitoring data with incident and maintenance records. Evidence: Monitoring and availability reports.
KPI: Reliability: Measurement and target: No deterioration against the agreed baseline; target reduction of ≥10% in recurring service-affecting faults where sufficient baseline data exists. Acceptance criteria: Reliability trend is stable or improving; adverse trends have documented corrective actions. Evidence: MTBF/fault-frequency trend report.
KPI: Performance compliance: Measurement and target: ≥95% of monitored components remain within agreed performance thresholds. Acceptance criteria: Threshold breaches are recorded, investigated and resolved or covered by an approved action plan. Evidence: Performance dashboard and alert records.
KPI: Maintenance-related incidents: Measurement and target: No critical incident caused by unauthorised or incorrectly performed maintenance. Acceptance criteria: All changes traceable to approved procedures; any maintenance-induced issue has completed root-cause analysis. Evidence: Change, incident and RCA records.
KPI: Trend analysis: Measurement and target: Monthly or Work Package-period analysis covering 100% of critical/high incidents and statistically significant recurring faults. Acceptance criteria: Report identifies recurring issues, causes, operational impact, priorities and recommended actions. Evidence: Trend-analysis report.
KPI: Corrective-action closure: Measurement and target: ≥90% of agreed maintenance actions completed by their due dates. Acceptance criteria: Overdue actions have approved revised dates and documented justification. Evidence: Corrective-action tracker.
KPI: Complex-issue escalation: Measurement and target: ≥95% escalated within the applicable SLA with complete technical information. Acceptance criteria: Receiving support level confirms sufficient diagnostic evidence was provided. Evidence: Escalation records and ticket audit.
The maintenance deliverable is accepted when:
- All scheduled maintenance and readiness checks were completed or formally deferred.
- Maintained systems passed post-maintenance testing.
- Availability, reliability and performance results met the applicable targets.
- Recurring faults were analysed and improvement actions proposed.
- Maintenance, incident, problem and escalation records are complete and traceable.
Continual Service Improvement
Proactive, structured and measurable continual approach ensuring BMD OPSLOOP Voice services evolve in line with the Agency’s needs while maintaining service stability and compliance.
Continuously improve the quality and efficiency of BMD OPSLOOP Voice services by monitoring and maintaining a healthy frontend environment, thus reducing the need for support.
Identify and provide opportunities for continuous service improvements.
KPI: CSI opportunity identification: Measurement and target: Minimum number established per Work Package — recommended: at least 2 substantiated opportunities per quarter. Acceptance criteria: Each opportunity includes problem statement, evidence, expected benefit, risk, effort, owner and priority. Evidence: CSI register and improvement proposals.
KPI: CSI assessment timeliness: Measurement and target: 100% of identified opportunities assessed within 20 working days or the Work Package timescale. Acceptance criteria: Opportunities are accepted, rejected, deferred or referred for approval with documented rationale. Evidence: CSI decision log.
KPI: Approved improvement delivery: Measurement and target: ≥90% of approved actions completed by the agreed due date. Acceptance criteria: Implementation and validation evidence provided; delays formally approved. Evidence: Improvement plan and completion records.
KPI: Measurable service benefit: Measurement and target: ≥80% of implemented improvements achieve their agreed success measure within the evaluation period. Acceptance criteria: Before-and-after results demonstrate the anticipated benefit or contain documented lessons learned. Evidence: Benefits-realisation report.
KPI: Support-demand reduction: Measurement and target: Target ≥10% reduction in avoidable/repetitive incidents against the agreed baseline, where statistically valid. Acceptance criteria: Reduction demonstrated using comparable periods, volumes and incident classifications. Evidence: Incident trend and baseline comparison.
KPI: Frontend environment health: Measurement and target: ≥95% compliance with agreed health thresholds; no unresolved critical health finding beyond its approved due date. Acceptance criteria: Monitoring shows stable or improving health; threshold breaches have corrective actions. Evidence: Health dashboard and action register.
KPI: Service stability after improvement: Measurement and target: 100% of changes implemented through approved change processes; no unmitigated critical incident caused by an improvement. Acceptance criteria: Change validation completed and rollback arrangements evidenced where applicable. Evidence: Change records, validation and post-implementation review.
KPI: Compliance preservation: Measurement and target: 100% of implemented improvements comply with applicable security, configuration, documentation and operational requirements. Acceptance criteria: Required reviews and approvals obtained; documentation and configuration baselines updated. Evidence: Compliance checklist and approval records.
KPI: Stakeholder acceptance: Measurement and target: ≥85% of sampled stakeholders confirm that delivered improvements provide the intended operational benefit. Acceptance criteria: Feedback collected after implementation and material concerns actioned. Evidence: Feedback and acceptance records.
The CSI deliverable is accepted when:
- A structured CSI register was maintained.
- Improvement opportunities were evidence-based, prioritised and assessed.
- Approved improvements were implemented through the appropriate governance and change processes.
- Benefits were measured against an agreed baseline.
- Service stability, security and compliance were preserved.
- Documentation, monitoring thresholds and operational procedures were updated as necessary.
Activities and tasks mentioned above will either have combinations or a single focus based on the requirements of the organization at each Work Package.
5. PAYMENT SCHEDULE
2026 BASE performance
Deliverable 01: Provision and on-going delivery of BMD OPSLOOP Voice Services.
Payment Milestones: Monthly, upon completion of monthly services in accordance with the performance indicators and service levels defined above, including SLA compliance, ticket resolution, system availability, security compliance, reporting, and user support/training activities.
2027, 2028 OPTIONAL performance
Deliverable 01: Provision and on-going delivery of BMD OPSLOOP Voice Services.
Quantity: Max. 12 Work Packages.
Payment Milestones: Monthly, upon completion of monthly services in accordance with the performance indicators and service levels defined above, including SLA compliance, ticket resolution, system availability, security compliance, reporting, and user support/training activities.
Since each Work Package may contain one, several, or all three service areas, the payment weighting should be established in the Work Package Order before execution.
a. Work Package payment model
Each Work Package defines its applicable service areas and allocates 100% of its value accordingly.
Operations-focused: 60% Implementation and operations, 30% Maintenance, 10% CSI.
Balanced service support: 45% Implementation and operations, 35% Maintenance, 20% CSI.
Maintenance-focused: 25% Implementation and operations, 60% Maintenance, 15% CSI.
Improvement-focused: 25% Implementation and operations, 25% Maintenance, 50% CSI.
Single-focus Work Package: 100% to the applicable area.
Within each service area, payment is divided as follows:
Implementation and operations payment allocation
Availability and operational readiness: 35%.
Incident response, resolution and escalation: 30%.
Operational records and reporting: 15%.
Standard installations and verification: 15%.
User satisfaction and service quality: 5%.
Total: 100%.
Maintenance payment allocation
Preventive maintenance and readiness checks: 30%.
Availability, reliability and performance: 30%.
Post-maintenance testing and configuration control: 15%.
Incident/fault trend analysis: 15%.
Corrective-action closure and reporting: 10%.
Total: 100%.
CSI payment allocation
CSI register and opportunity assessment: 20%.
Approved improvement implementation: 35%.
Measured benefits and support-demand reduction: 25%.
Stability, compliance and change control: 15%.
Stakeholder acceptance and documentation: 5%.
Total: 100%.
KPI-based payment calculation
For each payment component: Payable amount = Work Package value × component weight × performance factor.
KPI target fully achieved: Performance factor 100%.
Minor shortfall; no material operational impact and corrective action accepted: Performance factor 90%.
Moderate shortfall or repeated minor non-conformity: Performance factor 75%.
Material shortfall affecting service quality, but deliverable remains usable: Performance factor 50%.
Critical acceptance criterion not met: Performance factor 0%; payment withheld pending remediation.
Payment for each deliverable shall equal the deliverable value multiplied by the weighted achievement of its applicable KPI components. Amounts associated with remediable shortfalls shall be withheld and may be released following corrective action and successful re-verification within the agreed cure period. Failure to meet a mandatory acceptance criterion shall result in withholding of the affected component until acceptance is achieved. Critical criteria — such as operational availability, completion of daily readiness checks, correct escalation of critical incidents, post-maintenance functional testing, security compliance and configuration control — are to be treated as mandatory gates.
For recurring Work Packages, monthly payment with quarterly reconciliation will be used:
- 80% of the monthly Work Package value: paid following acceptance of the monthly operational, maintenance and CSI evidence.
- 15% performance retention: released quarterly based on aggregated KPI achievement.
- 5% final retention: released at Work Package closure following completion of outstanding actions, records, documentation and handover.
For short, milestone-based Work Packages:
- 20% upon approval of the Work Package plan, baseline and readiness arrangements.
- 60% upon completion of the operational, maintenance or improvement activities and achievement of the principal KPIs.
- 20% upon final acceptance, including reporting, documentation, corrective-action closure and handover.
7. PENALTIES AND INCENTIVES
Any penalties are subject to contract discussions.
8. GENERAL REQUIREMENTS
- NATO security policy compliance.
- Valid security clearance required.
- Qualified and experienced personnel.
- English language proficiency.
- Stable team with minimal rotation.
- Purchaser approval for personnel changes.
- Proper handling of PFE equipment.
- Use of ITSM system mandatory.
- Immediate escalation of blocking issues.
- End-user impact must be minimized.
9. PLACE OF PERFORMANCE
The Service will be delivered in Mons, Belgium in a typical office environment designated as a Class II Security Area. No travel required.
10. SCHEDULE
The BASE period of performance is September 1, 2026 (tentative) and will end December 31, 2026. If the 2027 option is exercised, the period of performance is January 1, 2027 to December 31, 2027. If the 2028 option is exercised, the period of performance is January 1, 2028 to December 31, 2028.
11. SECURITY
The security classification of the service will be up to NATO SECRET, preferable in progress of upgrade to NATO Cosmic Top Secret. The contractor providing the services under this SOW is required to hold a valid CTS clearance (NATO SECRET security clearance is accepted with CTS in progress – deadline to have CTS in place by end of October 2026).
12. QUALIFICATIONS
[See Requirements]
Requirements
11. SECURITY
- The contractor providing the services under this SOW is required to hold a valid NATO COSMIC TOP SECRET clearance (NATO SECRET security clearance is accepted with CTS in progress – deadline to have CTS in place by end of October 2026).
12. QUALIFICATIONS
Education
- A Bachelor’s degree in Computer Science, Information Technology, or a related field is preferred. Equivalent practical experience and industry certifications will also be considered.
Experience
- Minimum of 3-5 years of experience and strong knowledge of managing OpenScape Alarm Response (OScAR) server, including Cisco Voice Technologies such as Cisco CUCM, Cisco CUBE, and Cisco UCCX, and the ability to diagnose and resolve technical issues and support software and basic associated network related problems.
- Proven experience (3+ years) and knowledge of managing call distribution lists, voice mailboxes, ISDN, and TDM technologies, and troubleshooting on Legacy TDM PABX integration to Cisco Voice Technologies.
- Proven experience (2+ years) and good knowledge of monitoring platforms such as nGeniusOne, CA Performance Management, and CA Spectrum.
- Good knowledge in managing VMware vSphere and VMware vCenter.
- Basic knowledge in JavaScript, Python, or similar scripting languages.
- Knowledge and experience either working with or being in the military IT capacity specialized on telephony service products (Cisco, legacy PABX, etc.) delivering support of exercises or operations, including knowledge of use case scenarios of telephony service products (Cisco, legacy PABX, OScAR, etc.) in exercise and operations as well as day-to-day operational requirements of military bodies.
- Proficiency in troubleshooting hardware, software, and network issues.
- Knowledge of Active Directory, Group Policy, and Windows Update management.
- Strong communication and interpersonal skills for user support and training.
- Familiarity with IT best practices (ITIL) and tools.
- Experience with IT service management (ITSM) tools.
- Familiarity with IP networking fundamentals related to OScAR servers.
Skills
- Strong analytical and problem-solving skills.
- Excellent communication and interpersonal skills.
- Ability to work independently and as part of a team.
- Ability to prioritize tasks and meet deadlines.
- Knowledge of IT security best practices.
Language Proficiency
- Level 3 English language skills according to NATO STANAG 6001: Listening (3); Speaking (2); Reading (3); and Writing (2), or according to the Common European Framework of Reference for Languages, level B2-C1/Upper Intermediate-Advanced.
- ...Deadline Date: Friday 21 August 2026 Requirement:... ...to agreed requirements for compliance and audit purposes... ...calculating process, service, project and component... ...making Resourcing Supports managers and teams in... ...for the provision of support to services...SuggéréEmploi contractuelTemps complet
- ...candidates were non-compliant for the following reasons:... ...within a broader business and service management context. The candidate... ...Deadline Date: Friday 21 August 2026 Requirement: Senior Technician... ...as the following: Provide support to explore sourcing opportunities...SuggéréEmploi contractuelTemps complet
63 € par heure
...Deadline Date: Thursday 20 August 2026 Requirement: Technician (User Support) Location: Mons,... ...SECRET Please do NOT apply for any NATO contract positions... ...required to deliver systems and services for customer office automation....SuggéréEmploi contractuelEmploi en CDITemps complet- ...international intergovernmental organisation? We are supporting NATO in sourcing experienced professionals for mission-critical roles across the Alliance.... ...Chief Technician role Provide Level-2 and Service-Management support for Incidents, Service Requests, Change...SuggéréEmploi contractuelPour les contractants
- ...Deadline Date: Tuesday 25 August 2026 Requirement: Senior Service Manager Location: Mons, BE Full... ...availability and quality of engineering support delivered to the customer through... ...states and can be correctly accounted for; Will conduct periodic risk assessments...SuggéréEmploi contractuelPour les contractantsTemps complet
- ...NATO site in Mons needs a user support technician to cover a short-... ...devices behind office automation services. Installing and configuring... ...preparing software packages for automatic deployment. Contributing... ...~28 September to 31 December 2026, 425 hours in total. ~...Temps complet
- ...when they break. What the day looks like Level 2 and service management support: incidents, service requests, change requests and tasks, all... ..., events and conferences where you are the technical voice in the room. On call comes with the territory. Who you would...Emploi contractuelPour les contractants
- ...Deadline Date: Monday 24 August 2026 Requirement: Senior Learning... ...SECRET Duties & Role: In support of the NCI Academy's commercial training portfolio for external customers, the Senior... ...coordination of supplier-provided services. Address and resolve...Emploi contractuelTemps complet
- ...Deadline Date: Tuesday 18 August 2026 Requirement: Project Manager Location:... ...when necessary; Take responsibility for understanding client requirements, collecting... ...successful delivery of capability and services; Support reporting and communications with the Service...Emploi contractuelStageTemps complet
- ...Deadline Date: Monday 24 August 2026 Requirement: Network... ...incumbent will be responsible for the administration, maintenance... ...enterprise cyber defense tools that support network security monitoring,... ...design, implementation, and service transition. Support cabling...Emploi contractuelPour les contractantsTemps completÀ distance
67 € par heure
...Deadline Date: Thursday 13 August 2026 Requirement Title:... ...Please do NOT apply for any NATO contract positions unless... ...and implementation of the O&M support framework for the new... ...the new buildings and related services are aligned with the Agency's...Emploi contractuelEmploi en CDITemps complet- ...Service management where the service goes to the field. Reporting to the principal service... ...the SLA specifies Keeping engineering support available and good, in close coordination... ...configuration state and can be accounted for Running periodic risk assessments to...Pour les contractants
75 € par heure
...Deadline Date: Wednesday 12 August 2026 Requirement:... ...Please do NOT apply for any NATO contract positions unless... ...Provide administrative support to SMA O2, SMC leadership, Section... ...and presentations. Support Service Lifecycle Management Board activities...Emploi contractuelEmploi en CDITemps complet- ...hospitalier, vous participez activement à l'activité de salle du service d'Oncologie de l'Hôpital de Mons site Kennedy sous la... ...diplômé médecin par une faculté de médecine belge début juillet 2026; Détenir un quota d'heures Student at work suffisant pour prester...Emploi contractuelTravail d'été
- ...as the subject matter expert for the operation, configuration and... ..., operating procedures, support information. Supporting the... ...upgrades, migrations, refreshes and service transition. Previous work... .... ~5 October to 30 December 2026, 400 hours in total. ~ Occasional...
- ...Deadline Date: Tuesday 18 August 2026 Requirement: Cyber Security Software Engineer (CDSA) Location:... ...NATO SECRET Duties & Role: We are looking for a hands-on Cyber Security Software Engineer to support the Cyber Defence Situational Awareness (CDSA) platform...Emploi contractuelPour les contractantsTemps completÀ distance
- ..., redeveloped offices, and the support framework that has to work on day one. They are looking for an experienced infrastructure project... ...so the new buildings and services land aligned to the organisation... ...runs 1 October to 30 December 2026. You must be a citizen of a...Emploi contractuel
- ...organisation in Mons is looking for a business management and... ...budget work, resourcing, project support and internal controls, so it suits... ...and calculate process, service, project and component costs.... ...~28 September to 31 December 2026, 500 hours in total. ~ You must...
- ...Providing day to day technical and operational support to operations centre users Acting as... ...just querying Scripting and automation for data processing Experience integrating... ...late September to the end of December 2026 Your CV may not be up to date. That is...Emploi contractuelPour les contractants
- ...attached Worth knowing before you apply Fully on-site in Mons About 495 hours from late September to the end of December 2026 Practical detail ~ Contract engagement Your CV may not be up to date. That is not a problem, send me whatever you have and...Emploi contractuelStage
- .... This one sits underneath a service management organisation that... ...correspondence, records and workflows for the branch leadership... ...dashboards and briefings Supporting planning, scheduling and tracking... ...to project or portfolio support, ideally with MS Project or ServiceNow...Emploi contractuel
- ...decoration. You will design, build and integrate data and services on the Esri platform, and keep the web tools that people make... ...and monitoring the system On the job training for users, and support to multidisciplinary technical and operational teams Proposing...
- ...one of those defences runs on Linux, and the Alliance is looking for a hands-on Linux Engineer to keep that foundation rock-solid.... ...servers and the complex infrastructure that the Centre's cyber services depend on, building them, hardening them, and automating them with...
- ...leading international intergovernmental organization? This position supports the SHAPE J2 Capability Development (J2 CapDev) in collaboration... ...- and long-term AI opportunities with clear operational value for space-based ISR workflows. Prepare and curate labelled...
- ...SPACE PROGRAMME MANAGEMENT TEAM (PMT) SENIOR SUPPORT Location: Mons, Belgium (On-site) Language: Proficiency in English as defined... ...concepts, CONOPS, TTPs and implementation guidance for NATO Space capabilities Contribute to programme governanc e...
- ...sirops, verrerie, glaçons/garnitures. Profil • Expérience: 1–3 ans en bar/cocktails ou hôtellerie-restauration. • Formation: service/restauration, titre barman, bar à vins ou équivalent souhaité. • Langues: Français courant; anglais opérationnel (accueil,...Salaire horaireEmploi en CDITemps completTravail de soir
- ...Prise en charge individuelle au sein des consultations générales du service Activités au sein du Club : (9h30) - Animer les ateliers... ...Offre 14h30/semaine : contrat à durée déterminée du 01/09/2026 au 31/12/2026 (avec prolongation possible en fonction des subsides...Emploi contractuel
1040.66 € par mois
...Travaillez Remote au Portugal : Spécialiste Support des Commandes (Logement inclus) Aide au logement disponible pour les candidats... ...Excellentes compétences en résolution de problèmes. ~ Sens du service client. ~ À l'aise dans un environnement de back-office. ~...Travail à distanceSalaire horaireEmploi contractuelTravail supplémentaireBack officeTravail de jourTravail le weekend1050 € par mois
...Nous recherchons des francophones pour rejoindre notre équipe de support client en Grèce. Ce poste offre un environnement de travail... ...des clients efficacement tout en maintenant une haute qualité de service • Enregistrer avec précision les détails des interactions...Travail à distanceSalaire horaire776 € par mois
...Flexibility to work rotating shifts Previous moderation or customer support experience is a plus Salary & Benefits Option 1 –... ...and living room access Company-arranged accommodation for up to 14 months Approximate accommodation value: €200/month...Emploi contractuelTemps completTravail posté
Voulez-vous recevoir plus d'offres d'emploi ?
S'abonner et recevoir des offres d'emploi similaires à 2026-0122 Provision & Support for BMD OPSLOOP Voice Services (CTS) - FRI 21 Aug. Soyez parmi les premiers à postuler !